{"id":29612,"date":"2018-11-06T10:49:37","date_gmt":"2018-11-06T03:49:37","guid":{"rendered":"http:\/\/hicon.vn\/cms2\/en\/le-khoi-cong-du-an-xay-dung-nha-may-san-xuat-duoc-pham-my-pham-va-thuc-pham-chuc-nang\/"},"modified":"2019-01-18T09:52:53","modified_gmt":"2019-01-18T02:52:53","slug":"ground-breaking-ceremony-of-construction-works-factory-pharmaceutical-cosmetic-and-functional-foods","status":"publish","type":"post","link":"https:\/\/hiconmne.vn\/en\/ground-breaking-ceremony-of-construction-works-factory-pharmaceutical-cosmetic-and-functional-foods\/","title":{"rendered":"GROUND BREAKING CEREMONY OF CONSTRUCTION WORKS FACTORY PHARMACEUTICAL, COSMETIC AND FUNCTIONAL FOODS"},"content":{"rendered":"<p><span style=\"font-family: 'times new roman', times; font-size: medium;\">On 12.20.2016 HI-END Construction &amp; Project Management CO., JSC (HICON) held a groundbreaking ceremony Buildings Construction pharmaceutical factory, cosmetics and functional foods industrial park Que Vo II, Xa Ngoc, Que Vo district, Bac Ninh, as General contractor (EPC).<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times; font-size: medium;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-27897\" src=\"http:\/\/hicon.vn\/cms2\/wp-content\/uploads\/2018\/11\/anh_2.jpg\" alt=\"\" width=\"1600\" height=\"784\" srcset=\"https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2.jpg 1600w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-300x147.jpg 300w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-1024x502.jpg 1024w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-1200x588.jpg 1200w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-81x40.jpg 81w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/span>Construction projects Pharmaceutical plant is built on a total area of 10,000 m2. As expected, the Project of the pharmaceutical factory, cosmetics and functional foods will be completed after five months of construction.<\/p>\n<p>Investor of this project is very focused, standards of quality, schedule and safety in the construction of each item. Company HICON determined to complete the project on time, with the highest quality, ensuring absolute safety in construction.<\/p>\n<p><span style=\"font-family: 'times new roman', times; font-size: medium;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-27897\" src=\"http:\/\/hicon.vn\/cms2\/wp-content\/uploads\/2018\/11\/anh_2.jpg\" alt=\"\" width=\"1600\" height=\"784\" srcset=\"https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2.jpg 1600w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-300x147.jpg 300w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-1024x502.jpg 1024w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-1200x588.jpg 1200w, https:\/\/hiconmne.vn\/cms\/wp-content\/uploads\/2018\/11\/anh_2-81x40.jpg 81w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/span>At the groundbreaking ceremony, the HICON Company committed to implement the project with advanced construction methods, modern and believe that the collaboration between the companies will create conditions for the completion of works on schedule, quality and the highest safety.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 12.20.2016 HI-END Construction &amp; Project Management CO., JSC (HICON) held a groundbreaking ceremony Buildings Construction pharmaceutical factory, cosmetics and functional foods industrial park Que Vo II, Xa Ngoc, Que Vo district, Bac Ninh, as General contractor (EPC). Construction projects Pharmaceutical plant is built on a total area of 10,000 m2. As expected, the Project of the pharmaceutical factory, cosmetics and functional foods will be completed after five months of construction. Investor of this project is very focused, standards of quality, schedule and safety in the construction of each item. Company HICON determined to complete the project on time, with the highest quality, ensuring absolute safety in construction. At the groundbreaking ceremony, the HICON Company committed to implement the project with advanced construction methods, modern and believe that the collaboration between the companies will create conditions for the completion of works on schedule, quality and the highest safety.<\/p>\n","protected":false},"author":1,"featured_media":27897,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[211],"tags":[],"class_list":["post-29612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-noi-bo-en"],"_links":{"self":[{"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/posts\/29612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/comments?post=29612"}],"version-history":[{"count":2,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/posts\/29612\/revisions"}],"predecessor-version":[{"id":29614,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/posts\/29612\/revisions\/29614"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/media\/27897"}],"wp:attachment":[{"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/media?parent=29612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/categories?post=29612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hiconmne.vn\/en\/wp-json\/wp\/v2\/tags?post=29612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}